Pork Processing Facility Expansion

Issue:

  • A systems engineering group, responsible for a major pork processing plant expansion, approached CHL Systems to design and build over 300 pieces of equipment in an aggressive time line

Analysis:

  • CHL Systems developed a detailed plan to support the facility expansion requirements
  • The process required a modular conveying design to deliver a large amount of equipment in a short time frame

Solution:

  • CHL Systems designed, fabricated and installed over 300 pieces of stainless steel equipment, including over 3,300 linear feet of conveyors
  • Delivered the first pieces of equipment after just three weeks from the receipt of the order
  • Delivered 15 to 20 pieces of equipment per week for the next three months

Result:

  • Entire project was completed in a four month time frame
  • All pieces of equipment were design, built and installed on schedule